← Search the regulations ·Rules in plain English

14 CFR · PART 135

§ 135.417 Mechanical interruption summary report.

Official text · Current as of Oct 19, 2026 · from eCFR

Each certificate holder shall mail or deliver, before the end of the 10th day of the following month, a summary report of the following occurrences in multiengine aircraft for the preceding month to the responsible Flight Standards office:

(a) Each interruption to a flight, unscheduled change of aircraft en route, or unscheduled stop or diversion from a route, caused by known or suspected mechanical difficulties or malfunctions that are not required to be reported under § 135.415.

(b) The number of propeller featherings in flight, listed by type of propeller and engine and aircraft on which it was installed. Propeller featherings for training, demonstration, or flight check purposes need not be reported.

[Docket 16097, 43 FR 46783, Oct. 10, 1978, as amended by Amdt. 135-60, 61 FR 2616, Jan. 26, 1996; Docket FAA-2018-0119, Amdt. 135-139, 83 FR 9175, Mar. 5, 2018]

← § 135.415 § 135.419 →
Open on eCFR

ACE rules page: Part 135 in plain English

Not legal advice. This is the official text as published in the eCFR, which is updated daily but is not the legal edition. For legal purposes, use the annual Code of Federal Regulations or ask an aviation attorney.

All pages

Loading…